![]() |
| Home > |
Services
Forensic and Investigative Engineering
|
Transportation Engineering Intersection Improvement Analysis Intersection Improvement Analysis for a 5 legged intersection adjacent to Central High School in Park Hills, MO Allstate Consultants was selected to conduct a traffic study to provide recommendations for improving an existing 5 legged intersection. The existing intersection was stop controlled in two directions and had limited sight distance at three of the approaches. The study ultimately recommended a single lane roundabout. A geometric layout was provided to the city and the city’s engineer prepared the construction plans.
|
Feature Projects Transportation Engineering Park Hills Intersection Improvement Analysis Ashland Crossing Traffic Study Menards Sedalia Traffic Impact Study Boonville Main Street Enhancements Arbor Pointe Traffic Impact Study
|
|
Home | About Us |
Services | Projects |
Contact Us Copyright 2008 - Allstate Consultants LLC |